Waterproofing exterior walls and balconies with no scaffolding
Waterproofing of exterior walls, balcony joints and openings - working from the rope or a lifting platform we reach every point on a tall building without putting up scaffolding.
We find where the water gets in, clean, apply a suitable sealant and check after the work. Every job is documented with before and after photos.
Frequently asked questions
How long does waterproofing a 6-storey building take?
Usually 3-5 working days, depending on the length of the facade and the condition of the wall. An exact estimate after a short tour.
Do the residents have to leave?
No. The work is done from outside, and the residents carry on as usual.
Is there a warranty on the work?
Yes, a written warranty on the waterproofing - the details are in the quote.
Can waterproofing also be done from a lifting platform?
Yes. Depending on the wall and the access to the building we work from the rope or from a lifting platform, and sometimes both. On a short tour we will decide what suits your building, with no extra commitment.
